Most pricing advice starts with the market: what everyone else charges, what the customer will bear, what a “fair” rate looks like this year. All three of those are guesses about other people. None of them tells you whether the job you just quoted paid for the van it was carried in.
This is the other direction. You start with your own numbers — the hours you can actually sell in a year, the overhead you actually pay, what you actually need to take out — and only then look at a job. It produces a floor price. If the market is above it, you have room. If the market is below it, you have a decision to make, and this article ends with that decision rather than pretending it away.
Every figure below is an example input, not a market rate. There are no average prices in this piece, because no one publishes a defensible one and the number that matters is yours. Where a real published figure is used — the employer’s side of payroll tax, and the BLS average for benefit costs — it is named with the date it was checked.
Step 1: count the hours you can actually sell
Not the hours you work. The hours someone pays for.
Start with weeks. A full year has 52, but you do not sell 52. Take out holidays, sick days, the week the weather stops work, the week you take because it is August and everyone is away. In the example used throughout this article, that leaves 48 working weeks.
Then days and hours. Five days a week, eight hours a day on site: 48 × 5 × 8 = 1,920 hours a year.
That is not your sellable capacity either, and this is the step most people skip. A working day contains quoting, travel between jobs, supply runs, invoicing, callbacks that are not chargeable, and the phone call that turns into twenty minutes. Set your billable share by counting last month rather than by trusting a rule of thumb: take a normal week, list what you did in half-hour blocks, and mark which blocks someone paid for. For the example here, 70%.
1,920 × 0.70 = 1,344 billable hours a year.
If that number feels low, it should. It is 28 billable hours in an average working week (1,344 ÷ 48), and about 34 weeks of full-time hours — and it explains why an hourly rate that looks high on paper produces a modest year. In this example nearly a third of the working life is not billable, and any price built on 2,080 paid hours is built on a number that does not exist.
Write your own three numbers down now: weeks worked, hours per day, and the honest billable percentage. Everything else in this article divides by the last one.
Step 2: put the overhead on the hour, not the job
Overhead is everything you pay whether or not a job happens. The list for the example business, annually:
- liability and tool insurance — $3,600
- van running costs (fuel, service, tires, registration) — $6,000
- phone, internet, software — $1,800
- tool replacement — $2,400
- accounting and bookkeeping — $1,800
- licensing and permits — $600
- training — $600
- advertising — $1,200
- bank and card processing fees — $900
That totals $18,900 a year. Divided by 1,344 billable hours, overhead is $14.06 per billable hour.
Two things follow from doing it this way.
First, overhead stops being a vague tax on every job and becomes a number you can argue with. If insurance went up $600 this year, that is 45 cents an hour across the year — visible, small, and not a reason to redesign your pricing. If you added a second vehicle, that is a different conversation.
Second, you can now answer the hardest question in a slow month: how many hours do I have to sell to keep the lights on? $18,900 ÷ $62.42 (the floor calculated below) ≈ 303 hours. About seven and a half weeks of fully billable work covers the entire fixed cost of the business for a year. That number is worth knowing before you decide whether to take a job at a discount.
Step 3: add what you need to take out
The wage you would pay someone else to do your job, or the money you need the business to hand you — whichever is higher, and be honest about which. In the example, $65,000 a year.
$65,000 ÷ 1,344 = $48.36 per billable hour.
Add it to overhead: $14.06 + $48.36 = $62.42 per billable hour.
That is the floor. Every hour you sell below $62.42 makes the year worse, no matter how busy the diary looks. Note that it is not a wage — it is the point where the business breaks even on your time and pays for the things it needs to keep existing. Profit comes later, in step 6.
Step 4: add people properly
If you employ someone, the wage is not their cost. The employer’s side of payroll tax is fixed and published:
- Social security: 6.2% of wages, each side, on a wage base of $184,500 for 2026
- Medicare: 1.45% of wages, each side, with no wage base limit
- Federal unemployment (FUTA): 0.6% after the maximum 5.4% credit, on the first $7,000 of each employee’s wages for 2026
Source: IRS Publication 15 (2026), Circular E, Employer’s Tax Guide, checked 16 Nov 2026.
On a $22.00 hourly wage, social security and Medicare add 7.65%, or $1.68, making the helper $23.68 an hour before state unemployment insurance and workers’ compensation — both of which depend on your state and your trade, both of which you have to add yourself. FUTA adds a fixed $42 per employee per year at that wage level, which is trivial per hour but real.
One caution about the obvious shortcut. The Bureau of Labor Statistics publishes employer costs for employee compensation: for private industry in June 2026, wages and salaries were 70.0% and benefits 30.0% of total employer cost, at $46.89 per hour worked. Source: BLS Employer Costs for Employee Compensation, June 2026 (USDL-26-1494, released 9 September 2026), checked 16 Nov 2026. That 30.0% is an economy-wide average across employers who offer health cover, paid leave and retirement. If you offer none of those, it is not your number, and applying it to a $22 helper would overstate the cost by more than the state taxes you are trying to account for. Use it as a reminder that benefits are a real cost when you start offering them — not as a multiplier on a wage.
Whether the person helping you is an employee or an independent contractor is decided by tests published by the IRS and the Department of Labor, and by your state. It is not a pricing question and it is not something this article should answer. If the answer is unclear for your situation, that is a question for an accountant or a lawyer before the next job, not after.
The same applies to hours: if a helper works more than the threshold your state and federal rules set, the cost of those hours is not simply the hourly wage. Check the overtime rule that applies to you before you price a job that depends on long days.
Step 5: materials, including the trip for the wrong one
Materials are the easiest line to get right and the easiest to lie to yourself about. The honest version includes four things:
- the materials list at the price you actually paid
- a waste allowance — the offcut, the second tin, the sheet that got damaged
- the trip for the thing that was wrong, priced at your billable hour
- the returns you never got round to
For the example job — three rooms repainted — paint is $420, primer $95, and tape, plastic and sandpaper $60. That is $575. A 10% waste allowance adds $57.50. One trip for a mismatched color costs half an hour at the floor rate, $31.21, and that belongs in this line too: it is a cost the materials charge has to recover, and on a job like this one it is the only place it can be recovered. Materials with waste and the trip come to $663.71.
Putting the trip in the materials line rather than burying it in the labour hours is not tidiness. If it sits in labour, the quote looks like a labour quote and the trip disappears into an hourly rate nobody can inspect; if it sits here, you can see what the parts actually cost you to deliver. It also shows why a flat “20% markup on materials” can look adequate and then fail: 20% of $575 is $115, and the waste allowance plus the trip already take $88.71 of it, leaving $26.29 for the returns, the card fee and the rework nobody billed. On a smaller parts bill the same 20% does not even cover the trip, because the trip is a fixed cost and the percentage is not.
Which is why this article does not give you a materials markup percentage. There is no published figure behind the ones you will find on contractor blogs, and the number that works depends on how far you drive, what you carry in stock and how often you eat a return. What the markup has to cover is knowable: the trips, the card fee, the callback, the time spent quoting. Add those up from your own last ten jobs and you have a number you can defend. That is a different exercise from copying 20% off a web page, and it takes about an hour.
Step 6: the margin test
Now the part where most quotes quietly lose money: markup and margin are not the same thing, and the difference grows exactly where it matters.
| Markup on cost | Margin on price |
|---|---|
| 20% | 16.7% |
| 33.3% | 25.0% |
| 50% | 33.3% |
| 100% | 50.0% |
If you price by adding 20% to your cost, you are not making a 20% margin. You are making 16.7%, and on a job where the quote was tight to begin with, the difference is most of the profit.
The alternative is to decide the margin you need and divide:
price = direct cost ÷ (1 − target margin)
For the example, take the 24 hours of labor (12 at $62.42 and 12 at $23.68, which is $1,033.20) plus materials with waste and the trip ($663.71). Direct cost is $1,696.91.
- Cost + 20% markup → $2,036.29, a real margin of 16.7%, profit $339.38
- Direct cost ÷ (1 − 0.25) → $2,262.55, a real margin of 25%, profit $565.64
The gap between the two methods on one job is $226.26. Across forty jobs a year that is most of a month’s overhead, and it is invisible unless you do the division.
Two checks before you send the quote. First, the price per hour: $2,262.55 ÷ 24 hours = $94.27. If that number embarrasses you, the problem is upstream — the hours, the overhead or the pay target — and cutting the price only hides it. Second, the profit per hour: $565.64 ÷ 24 = $23.57. That is what each worked hour contributes above the floor — and above the overhead already loaded into it — which is the money that absorbs a bad month.
The price sheet
One page, filled in once a year and checked each quarter. This is the whole method in a form you can keep.
| # | Line | How it is calculated | Example |
|---|---|---|---|
| 1 | Weeks actually worked | 52 minus holidays, sick, weather, shutdown | 48 |
| 2 | Hours available | weeks × days × hours per day | 1,920 |
| 3 | Billable share | your honest percentage of the working day someone pays for | 70% |
| 4 | Billable hours a year | 2 × 3 | 1,344 |
| 5 | Overhead for the year | everything you pay whether or not a job happens | $18,900 |
| 6 | Overhead per billable hour | 5 ÷ 4 | $14.06 |
| 7 | What you need to take out | your wage, or the wage you would pay a replacement | $65,000 |
| 8 | Owner rate per billable hour | 7 ÷ 4 | $48.36 |
| 9 | Floor per billable hour | 6 + 8 | $62.42 |
| 10 | Employee cost per hour | wage × 1.0765, plus state unemployment and workers’ comp | $23.68 |
| 11 | Job labor | owner hours × 9, plus employee hours × 10 | $1,033.20 |
| 12 | Materials with waste and trips | at cost, plus allowance, plus the wrong-item trip | $663.71 |
| 13 | Direct cost | 11 + 12 | $1,696.91 |
| 14 | Target margin | your decision, not the market’s | 25% |
| 15 | Price | 13 ÷ (1 − 14) | $2,262.55 |
| 16 | Profit in the job | 15 − 13 | $565.64 |
Paste this into a spreadsheet as text, keep line 6 and line 9 visible somewhere you look at them, and the annual pricing argument with yourself becomes a lookup rather than a feeling.
One job, line by line, and the version that loses money
The job: three rooms repainted, 24 hours across two people, materials as above. Direct cost $1,696.91, price at a 25% target margin $2,262.55, profit $565.64.
Now the same job quoted at $1,500, because $1,500 is a round number that felt safe when the customer hesitated.
- Materials still cost $663.71. That leaves $836.29 to cover 24 hours of labor.
- $836.29 ÷ 24 = $34.85 an hour across both people.
- Your floor is $62.42. Your helper’s employer cost is $23.68.
- On that job you did not make a small profit. You lost $196.91 on the direct cost alone — before the quoting time, and before any return visit the job still needs.
Two lessons, both unglamorous. A round number is not a price; it is a guess that survived contact with a nervous moment. And the loss is always found late — after the invoice — because nothing in the quote showed the floor.
What changes by trade
The build is identical. What changes is which inputs move, and what the estimate risk is. Four trades, in the order the search data says people are looking — the rest of the family gets added to this page as it earns impressions rather than as separate posts.
Cleaning
The billable share is the whole story. Cleaning has almost no materials cost — supplies are a few percent of the price — so the floor rate and the travel between jobs carry everything. Two things move the number: condition, not square footage (a “3-bed” in good order and a 3-bed after a renovation are different jobs), and the gap between jobs, which is unbilled time that has to sit inside the hourly rate. Price the first visit as a survey you charge for, and the recurring visit as the product. The depth multipliers that matter are trip counts and product counts, not adjectives.
Painting
The materials share is high enough that percentage pricing hides things. Paint and primer can be a third of direct cost, which means a materials markup that looks generous can leave the labor under-recovered — and prep is where estimates fail, because prep is invisible until the wall is stripped. Two inputs to get right: coats (the variable customers negotiate) and surface condition, priced as a line rather than absorbed. Rooms as a unit price only work when you have measured your own hours per room on at least ten jobs.
Plumbing
You carry stock and a truck whether or not the phone rings, so overhead per billable hour is higher than the trades above, and the diagnostic hour is the most underpriced thing in the trade. It is a real hour, it produces information the customer keeps, and it should be priced as a visit — then credited against the repair if they proceed, which is a commercial decision, not a discount reflex. Parts markup is legitimate and has to cover the trip, the stock you hold and the returns you eat; the number belongs to your own records. Emergency work is not a mood, it is capacity: the premium pays for the hours you gave up, so it belongs in the owner’s rate, not sprinkled on the invoice.
Landscaping
Two inputs are specific to season work. First, capacity: the 48-week figure in this article is generous if four of those weeks are frozen ground or a summer drought, so count the weeks you can actually work and price the year across them. Second, equipment: a mower, a trailer and their maintenance are overhead, and they are also depreciating assets — the replacement cost is a real line, not a surprise. Disposal fees are direct cost, not overhead. And because travel is a fixed cost per visit, a minimum visit charge is arithmetic, not attitude.
The rest of the family
The same search expansion that produced these five produced twenty-two more — concrete, deck, fence, flooring, gutter cleaning, junk removal, land clearing, lawn mowing, moving, pressure washing, retaining wall, roofing, siding, stump grinding, tile, tree removal, welding, window cleaning among them. Each one changes which input moves, and each one is a section here before it is a page of its own. If you want yours added, ask — it is a legitimate reason to email.
When the arithmetic says charge more than the market bears
This is the honest problem the vendors’ calculators skip, because their answer is always “charge more”. Sometimes the number is above what your street will pay this month. Three moves, in order of preference.
1. Scope the job down to fit the number. The price is not the only variable — the work is. One coat instead of two, prep only, three rooms instead of four, the repair now and the repaint in spring. The customer keeps a working relationship and you keep the margin, because the hours fell with the scope. What you must not do is keep the scope and cut the price; that is the $1,500 job above.
2. Change the mix. If labor is what makes you expensive, sell less of it: supply-only, a maintenance visit instead of a full job, a repeat arrangement that fills a gap in the diary you were not going to sell anyway. A slightly lower rate on work that fits an empty Thursday is not a discount, it is a different product.
3. Decline, in one sentence, without a speech. You do not owe anyone a negotiation.
“I can’t do that for $1,500 — my cost on it is higher than that. What I can do is [one coat] for [$X], or the full job in [month] when I can fit it in at [$Y]. If neither works, I understand, and I’m glad to quote the next one.”
Three things that sentence does: it states the reason as a fact rather than a feeling, it offers two real alternatives, and it ends the conversation without burning the referral.
And the uncomfortable version: if your floor sits above the local market for years, the problem is not your pricing nerve. It is the model — jobs that need two trips, overhead that grew faster than hours, or a mix of work that cannot carry what the business costs. Raising the price on an unsellable model produces an empty diary and the same overhead. That is a bigger conversation than a quote, and it is the one worth having with your own numbers in front of you.
Three things this method will not do
- It will not tell you what the market charges. Nothing here is a benchmark. It tells you the price below which the job is a loss, and above which you are choosing a margin. The market decides whether you get to charge it.
- It will not fix a bad estimate. A 25% margin on 18 hours when the job takes 26 is a 25% margin on a job you lost money on. The hours are the estimate; the price is arithmetic on top of it. Track your actual hours against quoted ones for a month before you trust the output.
- It will not stay true. Insurance renews, wages move, the van dies, the billable share falls when you get busy with quoting. Re-check the sheet each quarter — it takes twenty minutes — and re-do lines 5, 7 and 3 at the turn of the year.
What to do this week
Fill in the sheet with last year’s real numbers, not this year’s hopes. Compare line 9 with what you have been charging. If line 9 is higher, you have found the reason the year felt busy and flat at the same time — and the next quote is where you fix it, not the year-end review.
Then put the terms in writing before the work starts, so the price is not the only thing being argued about later: the invoice and the terms that stop a chase.